top of page
Search

How a Gunite Pool Is Built in Rhode Island, Start to Finish

Feb 3
2 min read

Updated: Sep 28

From the first walk of the property to the day you swim.

Gunite pool with bluestone coping in its first summer, Rhode Island

A gunite pool is built by hand, in place, over a few seasons of planning and a few months of work. It helps to know what that looks like before you start, so here is how a pool project in Newport, Middletown or Portsmouth usually goes with us.



Walking the property, drawing the pool

Every project starts with a walk. I look at the slope, the soil, where the ledge might be, where the water runs and how the sun moves across the yard through the day. I also want to hear how you picture using the space: morning laps, kids jumping off the edge, quiet evenings by a fire. Then I draw the pool together with everything around it, the stone coping and terrace, the steps to the house, the fence, the planting and the drainage. We start with hand sketches and move into 2D plans and 3D views so you can really see it before anything is dug.


Watercolor concept sketch of a pool beside the house, Rhode Island


Engineering, permits and the ground

Once the design feels right, we finalize the engineering and handle the permits. On many coastal properties in Newport County that includes review by the Coastal Resources Management Council, and because I design with those setbacks in mind from the beginning, this step is usually paperwork rather than redesign. When the ground is ready we lay out the pool and dig, and then the steel goes in. The rebar cage is the skeleton of the pool, and its spacing and placement are among the things the Genesis program taught me never to rush. Plumbing and electrical lines are set at the same time.


Excavation for a gunite pool, Rhode Island


A gunite pool is built by hand, in place.

Spraying the shell, setting the stone

Then comes the day the pool takes shape. The gunite crew sprays the mix over the steel and it is shaped and trimmed by hand into its final form. The shell needs time to cure properly before we build on it. After that we set the tile line and the coping. We set the stone ourselves, so the coping, the terrace and any walls or steps are built by the same people who drew them. Then the interior finish and the equipment go in.



Dry stone steps beside a boulder, Rhode Island


Planting and the first swim

The last step is the one I enjoy most. We finish the grading, plant the beds, and fill and start up the pool. From signing to swimming, most of our pools take a few months of construction, with the design and permitting happening in the fall and winter before.







Beginning your project

Every installation we do is backed by a lifetime workmanship guarantee. If you want the bigger picture, read why I only build gunite pools or what to look for in a Newport gunite pool builder. You can also see more of our pool work.

Call me at 401-619-1607 or request a consultation when you are ready to talk about yours.

 
 
 

Comments


  • O’Connor Design Build on Instagram
bottom of page